Save inclusive reporting dates
StartDateEndDatePresetsMinRangeDaysMaxRangeDaysDisabledDatesChange
Store both ISO dates from Change. The range is inclusive and day-count bounds include both endpoints. Build Presets using your reporting calendar. DisabledDates blocks a range even when an unavailable day lies between the endpoints. Send both dates to the backend and apply the same constraints there.
Verify: Test reversed selection, a disabled day inside the range and a preset at a month boundary.